  • curprev 17:5017:50, 23 June 2022Camrenbt talk contribs 2,262 bytes +2,262 Created page with "<div style= "text-align:center;">''Message: Pulling a "Smart Pig" through the existing conduit can identify if sliplining is a possibility.''</div> ----</br> This project sought to rehabilitate a 100 year-old outlet conduit. The existing conduit consisted of a 24” diameter Riveted Steel Pipe conduit with Corrugated Metal Pipe extension installed when the dam was enlarged. The proposed rehab design was to slipline a 20" OD SDR 15.5 HDPE pipe and grout the annular space..."