ASDSO Dam Safety Toolbox

Replacement: Revision history

Jump to: navigation, search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

2 December 2022

15 September 2022

24 June 2022

  • curprev 17:2417:24, 24 June 2022Camrenbt talk contribs 5,967 bytes +1 No edit summary
  • curprev 16:1716:17, 24 June 2022Camrenbt talk contribs 5,966 bytes +5,966 Created page with "Conduit replacement is achieved by excavating the embankment, removing the existing conduit, and replacing with a new conduit. Common replacement pipe material types include Corrugated Metal Pipe, Concrete Pipe, and Plastic Pipe. Several important questions to ask include: #Is the existing means of control adequate? Is the gate / valve in a good condition, location, with no operational problems? If not, an evaluation of outlet configurations should be first. #The next ch..."