ASDSO Dam Safety Toolbox

Slipline Example 1: Revision history

Jump to: navigation, search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

2 December 2022

15 September 2022

23 June 2022

  • curprev 21:1821:18, 23 June 2022Camrenbt talk contribs 1,136 bytes +1,136 Created page with "<div style= "text-align:center;">''Message: Sliplining large diameter pipe takes extra planning.''</div> ----</br> <gallery mode="slideshow"> File:1SE1.jpg|As part of a major dam rehabilitation project, an 84-inch arch concrete outlet was slip lined with a 72-inch diameter welded steel pipe. File:1SE2.jpg|Due to the pipe size and other construction restrictions, the steel pipe was inserted into the outlet in multiple sections. A trolley system for moving the pipe up the..."