ASDSO Dam Safety Toolbox

Typical Toe Drain Pipe Construction: Revision history

Jump to: navigation, search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

2 December 2022

15 September 2022

27 June 2022

  • curprev 17:2017:20, 27 June 2022Camrenbt talk contribs 912 bytes +912 Created page with "<!--Example Page --> <div style= "text-align:center;"> <!-- Add message here --> ''Message: The construction of toe drain systems typically involves three components: sand filters, drain rock, and drain pipes.'' </div> ----</br> <!-- Add body paragraphs here --> ==Components of a two stage Toe Drain System== </br> ===Sand Filter=== Provides a barrier between the dam embankment and the drain rock. The sand filter prevents the movement of embankment soils into the drain pi..."