ASDSO Dam Safety Toolbox

Upstream Control: Revision history

Jump to: navigation, search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

2 December 2022

15 September 2022

24 June 2022

  • curprev 17:5417:54, 24 June 2022Camrenbt talk contribs 2,550 bytes +9 No edit summary
  • curprev 17:4317:43, 24 June 2022Camrenbt talk contribs 2,541 bytes −1 No edit summary
  • curprev 17:4117:41, 24 June 2022Camrenbt talk contribs 2,542 bytes +2,542 Created page with "Upstream Control with Sloping Gate Dams with inclined gates are common on small dams. They provide easy access for the gate operator but can present maintenance difficulties. The gate is susceptible to blockage and can be dislodged from the guides. If maintenance is required, the reservoir has to be drained. The gate stem should be buried in riprap or encase in concrete. {{Picture |image= <!-- Add image file name (ex. image.jpg) --> File:slidegate.jpg |link= <!--Add link..."